THE PROBLEM – Hotel need to provide 200 pipe penetrations through the Speedtile arch which was a major concern as it would cause distress to the stability of the individual tiles and the arch.
RUREGOLD SOLUTION – Place a 2 foot by 2 foot Ruregold “Patch” at each penetration to strengthen the face of the Speedtile prior to diamond drilling the penetrations from the bottom, which would allow for ease of penetration by drilling without damage to the tile.