Think about a rainscreen with the facia panels providing relief, color, texture and definition. With Darwen a simple change from extruded to slip cast gives the architect and the owner the best of both worlds and supports our mason contractors as well.
Facade
Fire Resistance/Concern for Anchors
ENGINEERS, PLEASE CONSIDER THE FOLLOWING – I just spoke with a national anchor testing lab. They told me that to get the test anchors out of the concrete, THEY USE A TORCH! Think about it. Ever wonder why resin anchors aren’t allowed over 6 stories in the UK, something else to think about.
When New Construction Turns Into Restoration
Cintec while primarily used as a retrofit high capacity cement based fireproof anchor is rarely considered for new construction so most designers are not familiar with the 50 year track record of this system. However when there is a deficiency in new construction or an anchor fails, it them, by definition, becomes a restoration project. The problem now becomes, most structural engineers are not restoration/adaptive engineers and are not familiar with this type of retrofit solution. It is however a common solution in the restoration, stabilization, strengthening community. Please reach out to www.cintec.com or our site www.conspec-rep.com for your repair/restoration needs.
CINTEC – Better, Faster, Cheaper?
What is the difference between a restoration engineer who specifies Cintec and one who doesn’t? This project on 5th Avenue in New York City needed a repair and an anchor for only this one piece of terracotta. The photo shows the preparation for the repair and the hole in the face of the terracotta piece that will accept the Cintec anchor. The engineer who considers Cintec a go to solution will use it on a project like the Helmsley Building where there are hundreds of substantial 2-4 foot anchor or on a project where there is only one anchor. If you do not specify or install Cintec please consider both your options and installed cost to solve this problem.
For those that use and specify Cintec they get it, for those aren’t they really DON’T GET IT. Not only is there less insult to the structure but the cost to the owner is substantially less and it is a truly sustainable solution. Think about it on your next project.
Darwen Terracotta and Laser Measurements
Berkshire Dimensions, Warren Wilford, doing the laser scanning for our Darwen project in the Bronx. Documentation yesterday, files and drawings in the hands of Darwen for final shop drawing details next week and once we get color approval it is off to the races. This is how we can keep our 14-16 week delivery schedule viable. Please consider Darwen on your next terracotta project especially if you need material in 2021.